DEKALB COUNTY, GA—W eather permitting, the Georgia Department of Transportation (Georgia DOT) construction partners will temporarily close interstate lanes at the locations below for the I-285/I-20 East Interchange project. The project will reconstruct the interstate system-to-system ramps at the I-285/I-20 East Interchange and add a combination of collector-distributor, or connecting lanes, and auxiliary lanes along I-20 east of the interchange and I-285 north of the interchange.
Where/When:
I-20 from the westbound ramp to I-285 northbound (Exit 67B)
- Monday, July 29, through Friday, Aug. 2, 11 p.m. to 5 a.m. (Nightly)
Traffic pacing operation on the I-20 westbound ramp
I-285 southbound exit ramp to the I-20 eastbound ramp
- Monday, July 29, through Friday, Aug. 2, 11 p.m. to 5 a.m. (Nightly)
Single left lane and left shoulder closure on the connecting lanes
I-20 from Panola Road (MM 71.3) to the Fairington Road overpass (MM 72.6)
- Monday, July 29, and Tuesday, July 30, from 9 a.m. to 2 p.m. (Daily)
Single right lane and right shoulder closure on I-20 eastbound
I-20 from Panola Road (MM 71.3) to the Fairington Road overpass (MM 72.6)
- Monday, July 29, through Saturday, Aug. 3, 11 p.m. to 5 a.m. (Nightly)
Alternating double left and right lane closures on I-20 eastbound and westbound
I-20 entrance ramps from I-285 northbound starting at the Rainbow Drive overpass (MM 46.8)
- Tuesday, July 30, through Thursday, Aug. 1, 1 p.m. until 2:30 p.m. (Daily)
Traffic pacing operation on I-20 eastbound, traffic will be held for up to five minutes
I-20 from Columbia Drive (MM 66.8) to Panola Road (MM 71.3)
- Tuesday, July 30, through Thursday, Aug. 1, 1 p.m. until 2:30 p.m. (Daily)
Traffic pacing operation on I-20 eastbound, traffic will be held for up to five minutes
I-20 entrance ramps at Panola Road (MM 71.6) and Wesley Chapel Road (MM 69.5)
- Tuesday, July 30, through Thursday, Aug.1, 1 p.m. until 2:30 p.m. (Daily)
Traffic pacing Operation on I-20 westbound, traffic will be held for up to five minutes
Hillandale Drive eastbound from east of Panola Road to DeKalb Medical Pkwy
- Monday, July 29, through Friday, Aug. 2, 9 a.m. to 3 p.m. (Daily)
Flagging operation
I-20 at the I-285 Interchange (MM 67.3)
- Monday, July 29, through Friday, Aug. 2, 11 p.m. to 5 a.m. (Nightly)
Traffic pacing operation on I-20, both eastbound and westbound
I-20 from the Panola Road (MM 71.4) to Wesley Chapel Road (MM 68.5)
- Thursday, Aug. 1, through Saturday, Aug. 3, 11 p.m. to 5 a.m. (Nightly)
Double right lane and right shoulder closures on I-20 westbound
I-20 from the I-285 Interchange (MM 67.3) to Wesley Chapel Road (MM 69.3)
- Thursday, Aug. 1, through Saturday, Aug. 3, 11 p.m. to 5 a.m. (Nightly)
Alternating double left and right lane closures on I-20 eastbound
|
Activity |
Start Date |
End Date |
Times |
I-20 Westbound |
- I-20 from the westbound ramp to I-285 northbound
|
Traffic pacing operation |
7/29/24 |
8/2/24 |
11 p.m. – 5 a.m. |
- I-20 from the Fairington Road overpass to Panola Road
|
Alternating double left and right lane closures |
7/29/24 |
8/3/24 |
11 p.m. – 5 a.m. |
- Entrance ramps at Panola Road and Wesley Chapel Road
|
Traffic pacing operation |
7/29/24 |
8/1/24 |
1 p.m. – 2:30 p.m. |
|
Traffic pacing Operation |
7/29/24 |
8/2/24 |
11 p.m. – 5 a.m. |
- I-20 from Panola Road to Wesley Chapel Road
|
Double right lane and right shoulder closures |
8/1/24 |
8/3/24 |
11 a.m. – 5 a.m. |
- I-285 Interchange to Wesley Chapel Road
|
Alternating double left and right lane closures |
8/1/24 |
8/3/24 |
11 p.m. – 5 a.m. |
I-20 Eastbound |
|
Traffic pacing operation |
7/29/24 |
8/2/24 |
11 p.m. – 5.a.m. |
- I-20 from Panola Road to the Fairington Road overpass
|
Single right lane and right shoulder closure |
7/29/24 |
7/30/24 |
9 a.m. – 2 p.m. |
- I-20 from Panola Road to the Fairington Road overpass
|
Alternating double left and right lane closures |
7/29/24 |
8/3/24 |
11 p.m. – 5 a.m. |
- Entrance ramps from I-285 northbound starting at Rainbow Drive
|
Traffic pacing operation |
7/30/24 |
8/1/24 |
1 p.m. – 2:30 p.m. |
- From Columbia Drive to Panola Road
|
Traffic pacing operation |
7/30/24 |
8/1/24 |
1 p.m. – 2:30 p.m |
I-285 Southbound |
|
|
|
|
- From the exit ramp to the I-20 eastbound connecting lanes
|
Single left lane and left shoulder closure |
7/29/24 |
8/2/24 |
11 p.m. – 5 a.m. |
Hillandale Drive Eastbound |
|
|
|
|
- From east of Panola Road to DeKalb Medical Pkwy
|
Flagging operation |
7/29/24 |
8/2/24 |
9 a.m. – 3 p.m. |
|